Apple Gate

Applegate Group receives research grant for low head hydropower study.

Publication Date: 
October, 2009
A report developed by the DOE’s Idaho National Engineering and Environmental Laboratory identified 91 sites for potential hydropower development at existing impoundments and diversions. The total estimated capacity of these sites was estimated at 782 MW. Because of the existing infrastructure, these sites could be developed with minimal cost and environmental impact.